Ping

Lot of 4 Vintage Scripto Mechanical Pencil Long Leads, MCM advertising design

Description: Lot of 4 Vintage Scripto Mechanical Pencil Long Leads, MCM advertising design. Condition is Used. Shipped with USPS Ground Advantage.

Price: 12 USD

Location: Edmonds, Washington

End Time: 2024-09-23T21:38:17.000Z

Shipping Cost: N/A USD

Product Images

Lot of 4 Vintage Scripto Mechanical Pencil  Long Leads, MCM advertising designLot of 4 Vintage Scripto Mechanical Pencil  Long Leads, MCM advertising designLot of 4 Vintage Scripto Mechanical Pencil  Long Leads, MCM advertising designLot of 4 Vintage Scripto Mechanical Pencil  Long Leads, MCM advertising designLot of 4 Vintage Scripto Mechanical Pencil  Long Leads, MCM advertising design

Item Specifics

All returns accepted: ReturnsNotAccepted

Brand: Scripto

Type: Continuous Twist

Lead Diameter: Plastic

Lead Grade: HB

Material: Plastic

Country/Region of Manufacture: United States

Vintage: Yes

Recommended

VINTAGE PIEZO-ELECTRIC SCRIPTO LIGHTER WITH THE ORIGINAL BOX AND INSTRUCTIONS
VINTAGE PIEZO-ELECTRIC SCRIPTO LIGHTER WITH THE ORIGINAL BOX AND INSTRUCTIONS

$19.95

View Details
Lot Of 5 Vintage Lighters -Citation, Maruman, Jet Flame S, Scripto, Bronica
Lot Of 5 Vintage Lighters -Citation, Maruman, Jet Flame S, Scripto, Bronica

$20.00

View Details
Vintage Scripto Vu Cigarette Lighter Del Chemical Advertising L2
Vintage Scripto Vu Cigarette Lighter Del Chemical Advertising L2

$14.99

View Details
Vintage  Scripto Vu-Lighter Fly Fisherman Fishing  Made In USA Cigarette Lighter
Vintage Scripto Vu-Lighter Fly Fisherman Fishing Made In USA Cigarette Lighter

$44.87

View Details
Scripto EZ Squeeze Utility Lighter 1 pk (12-PACK)
Scripto EZ Squeeze Utility Lighter 1 pk (12-PACK)

$87.13

View Details
Mechanical Pencil 8 Scripto W Advertisements Vtg Oil Tools Auto  Working
Mechanical Pencil 8 Scripto W Advertisements Vtg Oil Tools Auto Working

$15.40

View Details
Lot Of 7Vintage Scripto Translucent Mechanical Pencils Red Yellow Green Blue or
Lot Of 7Vintage Scripto Translucent Mechanical Pencils Red Yellow Green Blue or

$49.00

View Details
WCW Scripto Erasable Pens 4 Pack Kevin Nash Sting Goldberg New
WCW Scripto Erasable Pens 4 Pack Kevin Nash Sting Goldberg New

$11.99

View Details
Lot of  Vintage Scripto 4" Long Lead .046" Mechanical Pencil Eversharp
Lot of Vintage Scripto 4" Long Lead .046" Mechanical Pencil Eversharp

$14.99

View Details
Random Lot of  7 Mechanical Pencil - Skillcraft -Bic - ITOYA - Scripto
Random Lot of 7 Mechanical Pencil - Skillcraft -Bic - ITOYA - Scripto

$12.99

View Details